National Repository of Grey Literature 8 records found  Search took 0.00 seconds. 
Execution of Multifunctional Building in Lužice - Building Construction Project
Mouka, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabricated skeleton, design of main building machines and mechanisms including their time commitment, organization of construction of multipurpose building including drawings of construction site equipment, technological regulation for assembling of prefabricated skeleton and for making of reinforced concrete floor, inspection and testing plan for prefabricated skeleton assembly, lifting mechanism, assembly schemes for prefabricated skeleton elements, lifting mechanism verification schemes, item budget prefabricated skeleton chalk and instructions for building use and maintenance.
Construction-technological project of the extension of the production hall
Mézl, Petr ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
Workshop in Lukov - Execution of superstructure
Mouka, Jiří ; Novotný, Michal (referee) ; Nečasová, Barbora (advisor)
This Bachelor thesis with the solution of technological stages rough superstructure establishment in Lukov. This work includes accompanying a comprehensive technical report, the situation buildings with wider relationships routes, technical report solutions closer transport links and coordination oversized shipments, bill of quantities for solving technological processes, technological specifications for the erection of prefabricated skeleton and implementation of walling of Ytong system, organization construction for a given technological stage timetable for the installation of prefabricated skeleton, mechanical assemblies for the processes, inspection and test plans for prefabricated frame and brickwork, safety solved the technological stage of processing the selection of the lifting mechanism, the budget for the erection of prefabricated skeleton implementation of masonry work and for the realization of stairs, diagrams of construction details for mounting the skeleton diagrams and storage and transportation of prefabricated elements of the skeleton.
Implementation of Production Hall in Holešov
Ševela, Ondřej ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.
Implementation of Production Hall in Holešov
Ševela, Ondřej ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.
Construction-technological project of the extension of the production hall
Mézl, Petr ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
Execution of Multifunctional Building in Lužice - Building Construction Project
Mouka, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabricated skeleton, design of main building machines and mechanisms including their time commitment, organization of construction of multipurpose building including drawings of construction site equipment, technological regulation for assembling of prefabricated skeleton and for making of reinforced concrete floor, inspection and testing plan for prefabricated skeleton assembly, lifting mechanism, assembly schemes for prefabricated skeleton elements, lifting mechanism verification schemes, item budget prefabricated skeleton chalk and instructions for building use and maintenance.
Workshop in Lukov - Execution of superstructure
Mouka, Jiří ; Novotný, Michal (referee) ; Nečasová, Barbora (advisor)
This Bachelor thesis with the solution of technological stages rough superstructure establishment in Lukov. This work includes accompanying a comprehensive technical report, the situation buildings with wider relationships routes, technical report solutions closer transport links and coordination oversized shipments, bill of quantities for solving technological processes, technological specifications for the erection of prefabricated skeleton and implementation of walling of Ytong system, organization construction for a given technological stage timetable for the installation of prefabricated skeleton, mechanical assemblies for the processes, inspection and test plans for prefabricated frame and brickwork, safety solved the technological stage of processing the selection of the lifting mechanism, the budget for the erection of prefabricated skeleton implementation of masonry work and for the realization of stairs, diagrams of construction details for mounting the skeleton diagrams and storage and transportation of prefabricated elements of the skeleton.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.